State of the art technology and solid workmanship.

We noted down everything for everyone who wants to know every single last detail about our lifts, snowing machines and all the technological necessities for slope preparation and operation.

Detailled technical information about the lifts in the Hochoetz skiing region.

Name of lift Acherkogelbahn OchsengTypeenbahn Kühtailelift Mohrenkopflift
Type 8-MGD 4-MGD 3-CLF 2-CLF
Manufacturer Doppelmayr Doppelmayr Doppelmayr Doppelmayr
Year of construction 2000 1999 2001 1998
Lift type 8-er Gondelbahn 4-er Gondelbahn 3-er Sessellift 2-er Sessellift
Altitude base station 814 m 1507 m 1840 m 1858 m
Alt. midway/upper station 2023 m 2022 m 2071 m 2133 m
Difference in altitude 1209 m 511 m 231 m 275 m
Slant Length 2831 m 1707 m 736 m 680 m
Incline 86% 92% 45% 72,5%
Number of supports 16 16 11 8
Winding cable manufacturer Fatzer Austria Draht Austria Draht Austria Draht
Length of winding cable 5800 m 3500 m 1452 m 1342 m
Overall w. of winding cable 54 t 28 t 7,8 t 5 t
Winding cable diameter 50 mm 43 mm 43 mm 32 mm
Power 2x570 KW 660 KW 265 KW 156 KW
Equipment manufacturer CWA CWA Doppelmayr Doppelmayr
Number of equipments 66 89 122 114
Maximum capacity 1800 P/h 1420 P/h 1965 P/h 1400 P/h
Travel time 8 min. 6,3 min. 5,5 min. 4,7 min.
Travel speed 6 m/s 4,5 m/s 2,2 m/s 2,4 m/s
Construction time 5,5 Mon. 4,5 Mon. 3,5 Mon. 3 Mon.
Particularities DJ Ötzi Gondel Nr.1

Name of lift Balbachlift Acherkogel Sektion II Brunnenkopfbahn Zirbenlift
Type 2-CLF 2-CLF 4-KSB T-SL
Manufacturer Doppelmayr Doppelmayr Doppelmayr Doppelmayr
Year of construction 1998 1975 2003 1998
Lift type 2-er Sessellift 2-er Sessellift 4-er Sesselbahn Schlepplift
Altitude base station 1891 m 1410 m 1965 m 1931 m
Alt. midway/upper station 2126 m 2023 m 2179 m 1995 m
Difference in altitude 235 m 613 m 214 m 64 m
Slant Length 945 m 1432 m 657 m 231 m
Incline 67% 85% 72% 32%
Number of supports 9 15 9 3
Winding cable manufacturer Austria Draht Teufelberger Teufelberger Austria Draht
Length of winding cable 1893 m 2871 m 1371 m 572 m
Overall w. of winding cable 7 t 13,9 t 6,4 t 0,4 t
Winding cable diameter 32 mm 36 mm 36 mm 14,5 mm
Power 156 KW 250 KW 300 KW 18,5 KW
Equipment manufacturer Doppelmayr Doppelmayr Doppelmayr Doppelmayr
Number of equipments 159 140 48 49
Maximum capacity 1450 P/h 884 P/h 2.320 P/h 709 P/h
Travel time 6,5 min 9,4 min 2,2 min 1,7 min
Travel speed 2,4 m/s 2,5 m/s 5 m/s 2,3 m/s
Construction time 2,5 Mon. 9 Mon. 3 Mon. 1 Mon.
Particularities

Name of lift Ötzilift Weselelift Balbach-Wiesenlift
Type T-SL T-SL SL
Manufacturer Doppelmayr Doppelmayr Doppelmayr
Year of construction 2002 2004 1965
Lift type Schlepplift Schlepplift Schlepplift
Altitude base station 2006 m 1968 m 1557 m
Alt. midway/upper station 2041 m 2017 m 1622 m
Difference in altitude 35 m 49 m 65 m
Slant Length 130 m 189 m 252 m
Incline 32% 38% 30%
Number of supports 2 2 4
Winding cable manufacturer Austria Draht Teufelberger Teufelberger
Length of winding cable 340 m 392 m 506 m
Overall w. of winding cable 0,25 T 0,27 T 0,5 T
Winding cable diameter 14 mm 14,5 mm 18 mm
Power 11 KW 13 KW 35 KW
Equipment manufacturer Doppelmayr Doppelmayr Doppelmayr
Number of equipments 34 39 42
Maximum capacity 650 P/h 646 P/h 612 P/h
Travel time 1,2 min 1,5 min 2,3 min
Travel speed 1,8 m/s 1,8 m/s 2 m/s
Construction time 1 Mon. 1 Mon. 3 Mon.
Particularities

The snow machines in the Hochoetz skiing region!

We can artificially snow about 80% of the slopes in the Hochoetz skiing resort with over 25 state of the art snow machines in the event that there is little or no natural snow. That’s why we can actually guarantee optimal snow and slope conditions all winter long!

Fleet and slope preparation in the Hochoetz skiing resort

In order for you being able to really enjoy your winter holiday means that there are many measures to be taken before or after you had a great day out skiing. This includes the optimal slope preparation. In the Hochoetz skiing region 6 - 7 members of staff are responsible for preparing the 52 hectares of slopes. The team have five modern snow cats at their disposal. Two of the snow cats are equipped with so called cable winches allowing best possible slope preparation for the really steep parts.
The slope preparation is carried out daily between 17:00 and 08:30. During this time all slopes are shut for safety reasons!

Slope rescue in the Hochoetz skiing region

You are lucky when you don’t need them! If you should see a snow cat with bubble (for the injured), please make sure to make some room - to ensure a fast rescue. For further information about the slope rescue card for the Hochoetz skiing region, please click here

Environment and greening up

The slopes in the skiing resort are of course strained by the winter sport activities and by various construction measures. On this account we regularly fertilize and green the areas with special high alpine grass seed mixes, since the grass is also the main food source for our grazing cattle.

A frequently asked question:

Why is the operation stopped during the most beautiful times in the year (in spring between winter/summer and in autumn as of the middle of October)?

Answer: It’s inspection time!
These times are regulated by law and have to be adhered to! In order to ensure your safety, all technical elements from the brakes to the cables and all other parts are checked thouroughly. And not to forget, we carry out abseil and mountain training, where we "rescue" volunteers from the gondolas in order to be prepared for an emergency situation.

1. Austrian Icegloovillage 


become a facebook member


Getting there

Details

Prices/Info